Industrial leasing
Warehouses Rental
Storage, logistics and distribution space in Al Hayl, Siji and Al Thouban — specified properly before you sign.
Overview
Most warehouse leases go wrong on specification rather than price. A unit that reads well on a floor plan can be unusable once you account for clear height, column spacing, or the turning circle a forty-foot trailer needs in the yard.
We start from your operation: pallet positions, racking height, connected power load, vehicle movements per day and the shift pattern. Then we shortlist against that, with honest notes on what each unit gets wrong as well as right.
Fujairah's industrial vacancy is tight and the good stock is placed before it is advertised. Registering a requirement with us means you see units at the point they become available rather than the point they reach a portal.
How we work this
Specified against your operation
Clear height, column grid, floor loading and yard depth checked against your racking and vehicle movements before viewings.
Power confirmed in writing
Connected three-phase load is verified with the landlord up front — upgrading it after signing is slow and expensive.
Off-market access
We work the Al Hayl and Siji zones daily, so you see units before they are advertised, not weeks after.
What's included
- Clear height, column spacing and floor loading verified
- Three-phase power load confirmed with the landlord
- Loading bays, yard depth and heavy-vehicle access assessed
- Fit-out allowance and rent-free period negotiated
- Municipality approval for your trade licence activity
- Contract registration completed before handover
Warehouses Rental — common questions
Three-phase supply is standard across the Fujairah industrial zones, but the connected load varies considerably between buildings. We get the existing load confirmed in writing before terms are agreed, because upgrading it after signing is both slow and expensive.
Other services
Let's get started
Tell us what your
operation needs.
Send through the requirement — size, location, timeline — and you'll have a shortlist with honest notes on each unit within two working days.
